PDL Enterprises, Inc. Medical Construction Specialists
ICRA, ILSM, phasing and shutdowns

Building Inside Working Hospitals

Almost every PDL job happens in a hospital that stays open. The construction is often the easy part. Keeping the floor safe while it happens is the job.

ICRA containment barrier with zipper door in an occupied hospital

Infection control (ICRA)

We work to the ICRA permit the hospital sets for each phase: barrier type, negative air, dust control, walk-off mats and daily checks with infection prevention. Our field crews are ICRA trained.

Life safety (ILSM)

When work affects exits, fire rated walls or fire protection, we put interim life safety measures in place and keep them up until the work is closed.

Shutdowns

Medical gas, power, water and HVAC shutdowns are planned with facilities in advance, scheduled after hours when needed, and tested before the system goes back into service.

Phasing

We phase each job around the departments that cannot move, keep clear paths for staff and patients, and adjust when the hospital needs a space back.

Inspections and records

We coordinate inspections with the IOR and HCAI field staff and keep RFIs, submittals, daily reports and change orders current so the project closes out cleanly.

Our people

OSHA 30 supervisors, OSHA 10 crews, ICRA-trained field staff, and teams cleared for hospital security screening.

Soffit framing and ceiling grid in an emergency department expansion

Phased around patient care

Framing, ductwork and ceilings built behind containment while the department next door keeps running.

Operating room with surgical lights protected and floor covered during upgrade work

One room at a time

Rooms protected, worked and inspected before they go back into service.

Start a project

Call (818) 652-3549 or send your project details and we will get back to you.