Phased around patient care
Framing, ductwork and ceilings built behind containment while the department next door keeps running.
Almost every PDL job happens in a hospital that stays open. The construction is often the easy part. Keeping the floor safe while it happens is the job.

We work to the ICRA permit the hospital sets for each phase: barrier type, negative air, dust control, walk-off mats and daily checks with infection prevention. Our field crews are ICRA trained.
When work affects exits, fire rated walls or fire protection, we put interim life safety measures in place and keep them up until the work is closed.
Medical gas, power, water and HVAC shutdowns are planned with facilities in advance, scheduled after hours when needed, and tested before the system goes back into service.
We phase each job around the departments that cannot move, keep clear paths for staff and patients, and adjust when the hospital needs a space back.
We coordinate inspections with the IOR and HCAI field staff and keep RFIs, submittals, daily reports and change orders current so the project closes out cleanly.
OSHA 30 supervisors, OSHA 10 crews, ICRA-trained field staff, and teams cleared for hospital security screening.

Framing, ductwork and ceilings built behind containment while the department next door keeps running.

Rooms protected, worked and inspected before they go back into service.