2030 Hospital Seismic Compliance
By January 1, 2030, acute care can only be provided in hospital buildings that meet the state's structural (SPC) and nonstructural (NPC) seismic standards. A building meets the 2030 requirement with an SPC rating of 3, 4, 4D or 5 and an NPC rating of 5.
PDL builds the upgrades your engineer designs, inside a working hospital.

NPC upgrades
Bracing and anchorage of equipment, piping, ductwork, conduit, ceilings and partitions. NPC work touches every trade above the ceiling, so we walk the scope early and sequence it room by room.
SPC upgrades and SPC-4D retrofits
Structural strengthening and retrofit work built to the engineer of record's design, with HCAI review and IOR inspection at every stage.
Keeping departments open
We phase seismic work around the departments that cannot move. ICRA barriers, ILSM and after-hours shutdowns are planned with facilities before the first wall opens.
Common questions
What is the difference between SPC and NPC?
SPC rates the building's structure. NPC rates everything attached to it: equipment, piping, ductwork, electrical and the systems that keep the building running after an earthquake.
Can the work happen while the building stays open?
Yes. Most of our seismic work is done in occupied buildings, phased by area with ICRA containment and shutdowns scheduled with facilities.
Do you work with our engineer of record?
Yes. The engineer designs the upgrade. We build it, track RFIs and submittals, and coordinate inspections with the IOR and HCAI field staff.
Plan your 2030 work
Call (818) 652-3549 to talk through scope, phasing and schedule for your building.
